翻訳と辞書 |
GWR diesel shunters : ウィキペディア英語版 | GWR diesel shunters
The Great Western Railway purchased two diesel shunters, and ordered a further seven immediately prior to Nationalisation, which were delivered to British Rail in 1948-49. The two shunters used by the GWR were numbered 1 and 2, while a series commencing at 501 was planned for the new locomotives ordered in the 1940s. British Rail numbered 2 and the new locomotives in a series commencing at 15100. == 1 == This locomotive was built by Fowler in 1933 and was used at Swindon works. It was an 0-4-0 diesel mechanical shunter with a 70 hp engine, 3 ft diameter wheels and a wheelbase of 5 ft 6 in. It was very similar to the London, Midland and Scottish Railway's departmental locomotive number 2, which was built a couple of years later. It was withdrawn in 1940 and sold to the Ministry of Supply.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「GWR diesel shunters」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|